又大又长又租又大的房子叫什么歌,疯狂舔女人下面69互添,2021av天堂网手机版,韩国电影青春

 
News
  Company news
  Industrial news
  Technical Articles
ADD:7th floor,Building 6,Zhongyuntai Industrial Park,Tangtou Road,Shiyan Street,Baoan District,Shenzhen,China.
TEL:+86 0755-83413846 83428873
FAX:+86 0755-83427458
EMAIL:szeload@126.com
 
Technical Articles Home  -  News  -  Technical Articles
The distributed power station application process
Distributed mainly approval documents:
1. The land use right (forms: transfer or lease)
2. Power grid licensing company
3. The development and reform commission for examination and approval for the record
Step 1: determine the land use right
1. Find the target land, determine the land owner or the jurisdiction of the administrative units.
2. The bureau of land and resources that nature of the land, barren hill slope, agricultural land (need to build greenhouses photovoltaic power station or complementary production), fish ponds and lakes (built yu light complementary distributed power plant)
3. Introspection, cities, villages and towns as investment projects, the specific land transfer as the land. For example (a
Leave to farmers rent; B. public resources to the corresponding administrative unit rent; C. has been third-party leased land rent to a third party) note: factory do 1 mw of basic roof is 1 square, do 1 mw power station need to 25 to 30 acres of ground
The second step: licensing the interconnection
1. The plan passed by the national development and reform commission, the electric power company issued according to the project design access scheme draft (the national electric power company issued by free). Got the license for the grid
Step 3: the national development and reform commission for the record project (currently distributed power plant installations provinces are gap is very big, so have to promote the strength of the larger)
1. To land, development and reform commission (NDRC) new energy functions with distributed power plant the application form, the corresponding complete;
2. According to land condition, combining the local development and reform commission (NDRC), issue the plan feasibility study report (preliminary), note: there are a lot of unit can write the work
Previous:Photovoltaic pumping and lighting applications
Under:The principle and application of the photovoltaic inverter in the system
 
Home  |  About us   |    Products   |    News   |    Projects   |    Join us   |    Contact us
Hot keywords:Wind Controller    Inverter    AC and DC power distribution cabinet    Emergency backup power
Copyright © 2015-2018 Shenzhen Eload Energy Co., Ltd. All Rights Reserved.
Add:7th floor,Building 6,Zhongyuntai Industrial Park,Tangtou Road,Shiyan Street,Baoan District,Shenzhen,China.
Links: Wind Controller    Inverter    AC and DC power distribution cabinet    Emergency backup power    
主站蜘蛛池模板: 江川县| 曲水县| 乐陵市| 江永县| 日土县| 新蔡县| 广东省| 福贡县| 凌云县| 邛崃市| 隆德县| 洮南市| 黔西| 莱西市| 龙江县| 太仓市| 铜陵市| 牙克石市| 浠水县| 耒阳市| 临澧县| 卓资县| 扎鲁特旗| 武山县| 阜新| 明星| 鄂托克旗| 加查县| 绿春县| 浦县| 永丰县| 天镇县| 临沂市| 闽侯县| 孟连| 察隅县| 齐齐哈尔市| 屏东县| 油尖旺区| 巧家县| 朔州市|